Remember when I talked about people not knowing what “Go F12” meant due to it being from an older system? Turns out Grandeur was one of the last 2 ships in the fleet upgrading to the current ship standard. I was happy to know the old system so the adjustment period was shorter than it could have been. Upgrades on these older ships are not completely out of the question. Even Radiance is looking to upgrade its automation control system in the Fall.
Often times, theaters will buy the best equipment they can when the theater is being constructed. Once that happens, a lot of theaters keep the systems as long as possible as they still work. The community center in Sunnyvale kept their reel to reel player well into the era of cds because it still worked. My old theater company, The California Theatre Center, had some reels from their older shows archived. I don’t know why they kept it since they lacked any device with the ability to play them as far as I knew. The real challenge comes when you wait too long to replace uncommon equipment. Light boards have gained a lot of power which is necessary for controlling the moving lights. Conventional lights need only one address to control the brightness of the fixture. Moving heads need an address for each axis of control such as direction it’s pointing, the size of the light, and what color you want. Our most powerful lights need 31 addresses to get full control of the fixture. The stage on Majesty had only 2 out of 4 hydraulics working on the stage, and they leaked hydraulic fluid like crazy. The problem was that the company that made the original system went out of business. There were rumors circulating that the company was thinking about custom ordering new parts to make the stage work again. If they were thinking about it, the parts weren’t ready by the time we entered our month and a half dry dock in preparation for taking guests to Cuba.
Besides the theater, other systems on the ship are being changed. Last time I was on this ship, my emergency duty was to operate the life raft crane known as a davit. We now have a fancy new Marine Evacuation System which means I don’t have to crank the davit into position and we don’t have to spend extra time showing new crew members how to operate one. I’ll report back about this system some time in the Fall when I’ve been told they will do a test deployment of the system.
I can’t wait to work on a new ship. I’m curious how different the systems are compared to what I’m used to working with. It may be a while until they put me on one. I keep needing to request longer vacations which means I can’t request where they send me next. I guess I’ll get there eventually if I keep working on ships.